Loading

Synchronize Sheets on a Dashboard With a Single Page Control

Дата публикации: Apr 13, 2024
Задача
How to synchronize sheets on a dashboard with a single page control.
Действия
  1. Ensure all desired sheets have the same page controls. For more information on page controls, see Pages Shelf.
  2. Ensure that each sheet has the same level of detail.
  3. Verify that all page options are the same (for example, if "Show history" is enabled, all page controls need to have it enabled as well).
  4. On the dashboard, right-click the Page control and select Synchronized.
Номер статьи базы знаний

001458224

 
Загрузка
Salesforce Help | Article