Loading

Show Me Requires a Date Field to Create a Line Graph

Дата публикации: Apr 13, 2024
Задача
When attempting to create a line graph from the Show Me then the option is disabled unless the view includes a date field.
Действия
  1. Add at least one measure to the Rows or Columns shelf
  2. In the dropdown menu on the Marks card, select Line rather than Automatic
  3. Add at least one [Date] type data dimension to the Columns shelf, Rows shelf, Detail, Color, Size, Label or Path. Alternatively, the measure can be disaggregated.
Please note, if the dimension is on the same shelf as the measure then the data points will not be connected between dimension values.
Дополнительные ресурсы
The options on the Show Me are based are best practices, and typically a line chart is best suited for graphing trends over time.

Dimensions and Measures, Blue and Green
Convert a Measure to a Dimension
Change the Type of Mark in the View
Control the Appearance of Marks in the View
Choose the Right Chart Type for Your Data
Build a Basic View to Explore Your Data
 
Номер статьи базы знаний

001458235

Вложения

Line Chart_v2019.1.twbx

408 KB

 
Загрузка
Salesforce Help | Article