Loading

DPE rollup job intermittently fails with credit/writeback limit errors

Fecha de publicación: Sep 17, 2026
Descripción

On large data volume orgs, a DPE-based rollup definition that rewrites a very large number of records on each run can intermittently fail if the previous day's run takes longer than usual to complete. Because DPE measures the rolling 24-hour writeback window from job completion time rather than start time, a delayed prior-day run can still be within the window when the next day's run starts, pushing the combined writeback volume for that window over the applicable Data Pipelines limit.

Solución
  1. Review DPE job history for the affected rollup to confirm whether consecutive runs are overlapping (i.e., the prior run's completion time is close to the next run's scheduled start time).
  2. If runs are consistently taking longer than the scheduling interval allows, consider narrowing the rollup's scope (e.g., filtering to only recently-changed records) to reduce the volume rewritten per run.
  3. Adjust the job's scheduled start time to allow more buffer after the typical completion time of the prior run.
  4. If overlaps persist despite scheduling changes, open a support case for further investigation, since the writeback volume limit is a platform-level constraint.
Número del artículo de conocimiento

005460248

 
Cargando
Salesforce Help | Article