Loading
Slack 관련 문의처가 Salesforce Help로 통합 및 변경됩니다.더 많이 읽기

Scheduled Runs Continue Past the Specified End Date in Data 360 Calculated Insights

게시 일자: Oct 13, 2026
상세 설명

This article describes the behavior in Data 360 Calculated Insights where a schedule continues to run after the specified end date. This behavior is caused by how time zones are handled: the end deadline is uniformly evaluated as 23:59:59 UTC on the specified date.

솔루션

In Data 360 Calculated Insights, the schedule end deadline is evaluated based on UTC. Because of the time difference from your environment's time zone, the schedule may run even after the specified end date.

Specific Example

For example, consider the following settings in Japan Standard Time (JST, UTC+9).

  • Settings: Start "2026/10/01 06:30", End date "2026/10/01", Schedule "Every 24 hours"
  • Expected behavior: The schedule runs only once at 10/01 06:30 and then ends.
  • Actual behavior: In addition to 10/01 06:30, it also runs the next day at 10/02 06:30.
ItemSetting on screen (JST)Value held internally (UTC)Valid range converted to JST
Start date/time2026/10/01 06:302026/09/30 21:30:00 UTC2026/10/01 06:30:00 JST
End date2026/10/012026/10/01 23:59:59 UTC2026/10/02 08:59:59 JST

Cause

Internally, the system uniformly defines 23:59:59 UTC on the specified date as the end deadline. For example, in a JST (UTC+9) environment, the validity of the end date (10/01) continues until 08:59:59 JST on 10/02. As a result, at the execution time the next morning, 06:30 JST on 10/02 (21:30 UTC on 10/01), the schedule is still evaluated as within the end deadline, and a second run is triggered.

Workarounds

Adjust the schedule according to your operational goal using the following methods.

  1. If the schedule is [Every 24 hours]: Set the [End date] to the day before the intended last run date.
  2. If the schedule is anything other than the above, such as [Every 12 hours]: Design the start time and end date taking into account that the execution period is considered valid until 23:59:59 UTC on the specified date (08:59:59 the next day in JST).
Knowledge 기사 번호

005461250

 
로드 중
Salesforce Help | Article