Loading
Manage and Release Changes Easily and Collaboratively with DevOps...
Sommario
Seleziona filtri

          Nessun risultato
          Nessun risultato
          Ecco alcuni suggerimenti per la ricerca

          Controlla l'ortografia delle parole chiave.
          Usa termini di ricerca più generici.
          Seleziona meno filtri per ampliare la tua ricerca.

          Cerca in tutta la Guida di Salesforce
          Sync Test Providers

          Sync Test Providers

          Syncing ensures your pipeline has the latest test data and configurations from your connected test providers. Run a sync whenever test suites are added, removed, or updated in your provider tool.

          Required Editions

          Available in: Lightning Experience in Professional (API access required), Enterprise, Performance, Unlimited, and Developer Editions
          Not Available in: Government Cloud Plus. Contact your Salesforce account executive for more details.
          Not available in: EU Operating Zone. EU Operating zone is a special paid offering that provides an enhanced level of data residency commitment. DevOps Center is supported in orgs in the EU that aren't part of EU OZ, per standard product terms and conditions.
          User Permissions Needed
          To sync test providers: DevOps Testing Manager

          Before syncing, make sure these requirements are met:

          • To sync Salesforce Code Analyzer: You must be connected to GitHub and have access to the pipeline repository.
          • To sync Apex or Flow test providers: You must be authenticated to all environments in the pipeline.

          If these requirements aren't met, errors appear during sync. The error message indicates which connection or authentication is missing.

          Sync Test Provider window showing test providers with test suite counts and last sync details
          1. From the Pipeline view, select the Tests tab.
          2. Click Sync Test Provider.
          3. In the Sync Test Provider window, select the test provider you want to sync.
          4. Review the Test Suites count and Last Sync Details to confirm you're syncing the correct provider.
          5. Click Sync.
          Note
          Note It is recommended to schedule regular syncs after your team adds or updates test suites in your provider tool to keep your pipeline assignments accurate.
           
          Caricamento
          Salesforce Help | Article