Loading
Prepare for Email to Become the Default Login ExperienceRead More
US/Canada Toll-Free Callers Experiencing Silence After Agentforce Voice GreetingRead More
Salesforce Maps
Salesforce Maps Go-Live Checklist

Salesforce Maps Go-Live Checklist

Verify production readiness across five checklist categories: pre-launch readiness, testing and validation, training and documentation, change management, and ongoing maintenance.

Pre-Launch Readiness

Pre-Launch Readiness Checklist
CategoryItemComplete
Installation Salesforce Maps package installed in production
Installation Package version matches tested sandbox version
Installation Advanced add-on package installed if applicable
Licensing Permission set licenses purchased and available in sufficient quantity
Licensing Permission set licenses assigned to pilot users
Licensing Corresponding permission sets assigned to pilot users
Licensing Maps Admin permission set assigned to administrators
Configuration Maps and Location Services enabled
Configuration Permission groups created and users/profiles assigned
Configuration Button sets configured and assigned to permission groups
Configuration Base objects configured for all needed Salesforce objects
Configuration Address and coordinate fields correctly mapped on all base objects
Data Geocoding batch run on all relevant records
Data Geocoding success rate verified (spot-check sample records)
Data Address data quality issues identified and remediated
Data Records plotting in expected geographic locations
Layers Corporate marker layers created for key use cases
Layers Shape layers configured for territories or regions
Layers Data layers configured if applicable
Layers Folder permissions configured (Corporate and Personal)
Features Click2Create field sets configured for Lead or Account
Features Check In/Out configured with custom disposition if applicable
Features Custom action buttons configured if applicable
Features Auto Assignment configured if applicable
Routing & Schedule Route defaults configured (transportation mode, start location, stop duration)
Routing & Schedule Schedule calendar sync configured (Outlook or Google) if applicable
Routing & Schedule Maps Advanced visit plans configured if applicable
Security Routing role security setting configured per requirements
Security Debug Logs confirmed disabled (unless actively troubleshooting)
Security Folder Administrator permission assigned only where needed
Security PKCE settings verified if enforced org-wide
Security UserRole query permission verified if Show User Folders or Routing Role Security enabled

Testing and Validation

Testing and Validation Checklist
CategoryItemComplete
Admin Testing End-to-end smoke test completed in production
Admin Testing Test user can successfully open Salesforce Maps
Admin Testing Records plot correctly on map
Admin Testing Layers load and appear correctly
Admin Testing Click2Create creates records successfully
Admin Testing Check In/Out logs activities correctly
Admin Testing Routes build and optimize with correct drive time/mileage
Admin Testing Search returns expected results (POI, records)
Pilot Testing Pilot user group identified and licensed
Pilot Testing Pilot users completed initial training
Pilot Testing Pilot users successfully performed core workflows
Pilot Testing Pilot feedback collected and documented
Pilot Testing Critical issues from pilot resolved
Mobile Testing Maps Mobile tested on iOS devices (if applicable)
Mobile Testing Maps Mobile tested on Android devices (if applicable)
Mobile Testing Check In from mobile device verified
Mobile Testing Current location accuracy verified on mobile
Mobile Testing Mobile performance acceptable with configured layers

Training and Documentation

Training and Documentation Checklist
CategoryItemComplete
End-User Training Training materials created for field reps (plot territory, build route, and check in or out)
End-User Training Training materials created for sales managers (territory review and route oversight)
End-User Training Training sessions scheduled for rollout waves
End-User Training Quick reference guides created (one-page SOPs)
End-User Training Demo recordings or videos created for common tasks
Admin Documentation Configuration documentation completed
Admin Documentation Permission group matrix documented
Admin Documentation Base object configuration documented
Admin Documentation Layer naming conventions documented
Admin Documentation Troubleshooting guide created with FAQs from pilot
Support Support channel identified (help desk, Slack, email)
Support Support team trained on common issues
Support Escalation path to Salesforce Support documented

Change Management

Change Management Checklist
CategoryItemComplete
Communication Stakeholder communication plan created
Communication Go-live announcement drafted (emphasizing benefits)
Communication Leadership briefed on rollout plan and success criteria
Communication End users notified of upcoming changes and training
Rollout Plan Phased rollout plan documented (waves, timelines)
Rollout Plan Success criteria defined and measurable
Rollout Plan Rollback plan documented in case of critical issues
Rollout Plan Go-live date selected (avoid peak business periods)
Adoption Adoption metrics identified (weekly active users, routes created, check-ins logged)
Adoption Reporting dashboard created to track adoption
Adoption Weekly adoption review meetings scheduled for the first month
Adoption Feedback collection mechanism established (survey, office hours)

Ongoing Maintenance

Ongoing Maintenance Checklist
CategoryItemComplete
Release Management Process established to review Maps release notes
Release Management Custom permission sets (if used) flagged for manual updates each release
Release Management Sandbox testing scheduled for each major release
Data Quality Quarterly address data quality reviews scheduled
Data Quality Periodic geocoding batch runs scheduled
Data Quality Process to identify and fix failed geocoding records
Configuration Audits Quarterly configuration audits scheduled (base objects, layers, permission groups)
Configuration Audits Process to prune unused or duplicate layers
Configuration Audits License usage review process (quarterly)

Final Go-Live Decision

Before proceeding with full rollout, confirm:

  • All items in Pre-Launch Readiness are complete.
  • All items in Testing and Validation are complete.
  • Training materials and support channels are in place.
  • Pilot testing identified no critical blocking issues.
  • Stakeholders have approved the go-live.
  • Support team is ready to handle increased volume.
  • Adoption metrics and reporting are configured.
Tip
Tip Start with a small pilot team, resolve issues discovered during pilot testing, and then roll out to the wider organization in phases. Phased rollout reduces risk and helps you refine training and support based on real-world usage feedback.
Note
Note Plan your first rollout wave during a low-activity period to allow time for users to adjust and for your support team to handle questions.

Post-Launch Activities

Within the first week:

  • Monitor adoption metrics daily.
  • Hold daily stand-ups with the support team.
  • Address critical issues immediately.
  • Send a thank-you message to pilot users.

Within the first month:

  • Review adoption metrics weekly.
  • Collect and analyze user feedback.
  • Identify and address training gaps.
  • Celebrate early wins and share success stories.
  • Plan the next rollout wave.

Within the first quarter:

  • Complete rollout to all planned user groups.
  • Conduct the first configuration audit.
  • Measure outcome metrics (visits per rep and drive time reduction).
  • Share results with leadership.
  • Transition to the ongoing maintenance schedule.
 
Loading
Salesforce Help | Article