Loading
Upcoming Mandatory Changes to Public Key Infrastructure (PKI)Read More
Salesforce Enforces New Security Requirements in Summer 2026Read More
Agentforce Field Service and Operations
Table of Contents
Select Filters

          No results
          No results
          Here are some search tips

          Check the spelling of your keywords.
          Use more general search terms.
          Select fewer filters to broaden your search.

          Search all of Salesforce Help
          Work Capacity Usage Fields

          Work Capacity Usage Fields

          Work Capacity Usages have the following fields.

          Required Editions

          Available in: both Salesforce Classic (not available in all orgs) and Lightning Experience
          The Agentforce Field Service and Operations core features, managed package, and mobile app are available in Enterprise, Unlimited, and Developer Editions.
          Field Name Description
          Available Capacity (in hours) This value is copied from the AvailCapacityHours of the WorkCapacityAvailability object for the service territory on the same date.
          Consumption to Limit Ratio (%)

          (Time consumed in hours / Limit in hours) * 100

          Note the following exceptions.

          • If a limit isn’t defined (-1) the ratio is -1 (even if consumption is 0 or higher).
          • If consumption is 0, and the limit is a number greater than 0, then the ration is 0.
          • If consumption is 0 and the limit is 0, the ration is 100% hard-coded.
          • If consumption is greater than 0 and the limit is 0, the ration is calculated as if the limit = 0.99 in order to get a result that’s higher than 100%.
          End Date End date of the time period for which the capacity usage is accumulated.
          Field Value Value of Service Appointment Field, the work-specific criteria of the capacity limit.
          Field Value Display Name Workstream display name of Field Value.
          Limit Override Policy Defines the relaxation behavior that determines the limit override policy for this limit if the limit override policy is set per limit in Field Service Settings. If the limit override policy isn’t set per limit, this value is ignored.
          Limitation (in hours) The Limitation (in hours) depends on the Limitation Unit. If the Limitation Unit is Hours the value is copied from LimitationValue in the WorkCapacityLimit object. If the Limitation Unit is Percentage, the percentage is calculated relative to the availability in the WorkCapacityAvailability object.
          Limitation (in percentage) If the Limitation Units is Percentage this value is copied from the LimitationValue field of the WorkCapacityLimit object.
          Limitation Units Defines whether the limitation for the workstream in the service territory is in hours or as a percentage of all the available hours for all the workstreams for which limitations exist in the service territory on a specific day.
          Original Limitation If the limit value is changed after the work capacity usage was created, this parameter is the original value.
          Service Appointment Field Work-specific criteria used to define the capacity limit for the workstream.
          Service Territory ID of the service territory of the work capacity workstream for which usage is accumulated.
          Service Territory Limit Applies this work capacity limit to the entire service territory.
          Start Date Start date of the time period for which the capacity usage is accumulated.
          Time Consumed (in hours) Time consumed in hours by the workstream in the service territory for the defined period.
          Time Consumed (in minutes) Time consumed in minutes by the workstream in the service territory for the defined period.
          Time Period Duration for defining the capacity limitation on the workstream in the service territory.
          Usage Number A unique identifying number.
           
          Loading
          Salesforce Help | Article